Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 16 Next »

The scheduled production rate and injection rate.

In Field Development Planning (FDP) the 

and Well & Reservoir Management (WRM) related to planning the Production Well Targets and Injection Well Targets, based on the current reservoir recovery schedule.


The production rates may be set directly via pump settings or calculated based on THP and formation pressure  p_e (which is a usual case in injection wells):

(1) q^{\uparrow} = J \cdot ( p_e - p_{wf} )
(2) q^{\downarrow}_{WI} = J_{WI} \cdot ( p_{wf} - p_e )
(3) q^{\downarrow}_{GI} = J_{GI} \cdot ( p_{wf} - p_e )

Producing wells may spontaneously vary between Constant rate production: qL = const and Constant pressure production: pwf = const (see Constant rate production: qL = const for alternation details).


There are different methods to calculate optimal Production Targets (see  Production Targets Optimisation @model).

See Also


Petroleum Industry / Upstream / Production / Field Development Plan

Subsurface Production / Well & Reservoir Management 

Subsurface E&P Disciplines / Production Technology 

Constant rate production: qL = const ] [ Constant pressure production: pwf = const ] 

 [ Production Targets Optimisation @model ]




  • No labels