...
based on the current reservoir recovery schedule.
The production rates may be set directly via pump settings or calculated from THP and of formation pressure
LaTeX Math Inline | ||
---|---|---|
|
LaTeX Math Block | ||||
---|---|---|---|---|
| ||||
q^{\uparrow}_t = J_t \cdot ( p_e} - p_{wf} ) |
LaTeX Math Block | ||||
---|---|---|---|---|
| ||||
G^{\downarrow}_w = J_w \cdot ( p_{wf - p_e ) |
LaTeX Math Block | ||||
---|---|---|---|---|
| ||||
G^{\downarrow}_g = J_g \cdot ( p_{wf} - p_e ) |
Producing wells may spontaneously vary between Constant rate production: qL = const and Constant pressure production: pwf = const (see Constant rate production: qL = const for alternation details).
There are different methods to calculate optimal Production Targets (see Production Targets Optimisation @model).
...
Subsurface E&P Disciplines / Production Technology
[ Constant rate production: qL = const ] [ Constant pressure production: pwf = const ]