The scheduled production rate and injection rate.

In Part of Field Development Planning (FDP) related to planning the field-average or individual production and injection targets,based on the selected reservoir recovery schedule the  FDP Production Targets set the schedule for full-field production rate and injection rate.

In Well & Reservoir Management (WRM) the WRM Production Targets set the schedule for the individual Production Well Targets and Injection Well Targets, in order to achieve the FDP Production Targets.


The production rates may be set directly via pump settings or calculated based on THP and formation pressure 

LaTeX Math Inline
bodyp_e
(which is a usual case in injection wells):

LaTeX Math Block
anchor3WM13
alignmentleft
q^{\uparrow} = J \cdot ( p_e - p_{wf} )
LaTeX Math Block
anchor9HEU2
alignmentleft
q^{\downarrow}_{WI} = J_{WI} \cdot ( p_{wf} - p_e )
LaTeX Math Block
anchorFQ5IH
alignmentleft
q^{\downarrow}_{GI} = J_{GI} \cdot ( p_{wf} - p_e )


Producing wells may spontaneously vary between Constant rate production: qL = const and Constant pressure production: pwf = const (see Constant rate production: qL = const for alternation details).


There are different methods to calculate optimal Production Targets (see  Production Targets Optimisation @model).

See Also

...

Petroleum Industry / Upstream / Production / Field Development Plan

Subsurface Production / Well & Reservoir Management 

Subsurface E&P Disciplines / Production Technology 

Constant rate production: qL = const ] [ Constant pressure production: pwf = const ] 

 [ Production Targets Optimisation @model ]