Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


A set of Subsurface Production Operational activities towards execution of Field Development Plan.


The key instrument of WRM is Nodal Analysis which leads to a proper selection of WRM Activities.


The WRM Activities are usually classified by the purpose: 


The WRM Activities are facilitated by following execution mechanisms: 


Prioritizing of WRM Activities is based on technical feasibility and economics, provided by WRM Activity Value @model.


This particularly leads to the following major asset challenges:

1Where to drill the

...

titleContent
Panel
bgColorAzure

Children Display
alltrue
depth1

There are five major categories in WRM

...

iconfalse

1. Drilling new well or new side-track

2. Workover on existing wells

3. Changing flowrate on existing wells

4. Changing the temperature and composition of injection fluid

5. Changing the surface infrastructure to avail all the subsurface production to be gathered in the tanks

This leads to the four major asset challengs:

...

iconfalse

...

new well or side-track and how

...

to completion it ?
2

...

Which wells

...

...

 and how ?
3

...

Which wells to change the flow rate and whether increase or decrease ?
4

...

What fluid and at what time to inject ?

...

5Is there a bottleneck in surface infrastructure and whether it needs update ?


The answers to these questions are provided by playing the various scenarios over the calibrated full-field flow model.


See Also

...

Petroleum Industry / Upstream / Production / Subsurface Production

Nodal Analysis ]Field Development Planning ]

WRM Activities ]WRM Activity Value @model ]


Show If
grouparax


Panel
bgColorpapayawhip
titleARAX

WRM.xls