Page tree

@wikipedia


A set of subsurface and surface mechanical construction facilities related to a well.

If no mechanical construction is pulled down yet then completion status is called open-hole.

This only happens when the Drilling rig is still on well site and waiting for well completion.

Every drilling eventually ends up with completing the well and then it gets status as cased-hole except sometimes the bottom part of the well may stay open-hole to ensure the best well-reservoir contact.


Surface PipesAnnuliAnnuli components

Wellhead

Xmas tree

SRP Pump

SRP Control Unit

ESP Control Unit

Conductor

Casing

Liner

Tubing

Y-tool

A-Annulus

B-Annulus

C-Annulus

Packer

Pipe centralisers

ESP power cable

Data transmission cable 


Fig. 1. Key elements of Well completion.Fig. 2. A simple example of Well schematic.



See Also


Petroleum Industry / Upstream / Petroleum Well 

Well schematic ] [ Single-string ] 

Lift mechanism ]


  • No labels