A set of Subsurface Production Operational activities towards execution of Field Development Plan.
The key instrument of WRM is Nodal Analysis which leads to a proper selection of WRM Activities.
The WRM Activities are usually classified by the purpose:
Operational HSE | Production acceleration | Production Cost | Sweep efficiency | ||||||
---|---|---|---|---|---|---|---|---|---|
Infill drilling | Production targets | designing & maintaining integrity | designing & maintaining integrity | Increasing (Drilling) | Optimising (Conformance control) | ||||
Infill drilling | Side-tracks | Flow Stimulation | Flow Shut-off | EOR |
The WRM Activities are facilitated by following execution mechanisms:
Subsurface | Surface | |||
---|---|---|---|---|
Drilling & Completion | Workovers | Wireline | EOR facilities and procedures |
Prioritizing of WRM Activities is based on technical feasibility and economics, provided by WRM Activity Value @model.
This particularly leads to the following major asset challenges:
1 | Where to drill the |
---|
...
title | Content |
---|
Panel | ||||||
---|---|---|---|---|---|---|
| ||||||
|
There are five major categories in WRM
...
icon | false |
---|
1. Drilling new well or new side-track
2. Workover on existing wells
3. Changing flowrate on existing wells
4. Changing the temperature and chemical of injection fluid
5. Chaning the surface infrastructure to remove the bottle-neck
This leads to the four major asset challengs:
...
icon | false |
---|
...
new well or side-track and how |
...
to completion it ? |
2 |
---|
...
Which wells |
...
to workover |
...
and how ? |
3 |
---|
...
Which wells to change the flow rate and whether increase or decrease ? | |
4 |
...
What fluid and at what time to inject ? | |
5 |
...
Is there |
...
a |
...
bottleneck in surface infrastructure and whether it needs update ? |
The answers to these questions are provided by playing the various scenarios over the calibrated full-field flow model.