Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

@wikipedia 


Part of Well & Reservoir Surveillance and one of the Subsurface E&P Disciplinesrelated to measuring

...

well volumetric flow rate and wellbore pressure in

...

one or few selected wells

...

[ see also Well testing @ Wikipedia ]

and analysing pressure-rate correlation.

Unlike production analysis which normally covers a time period from few months to many years, well tests are rather short and normally take from few hours to few weeks.


The quantitative interpretation is based on: 


There are different ways to classify the 
well tests.

One way is to split well tests into two major categories:

...


The other way is to split well tests by the location where the measurements are taken and the well completion status:

MRST – Multirate Step Test


Third way is to split well tests by number of wells involved: 

...

Multiwell Routine Fitting

...

...

...


Drawdown Test (DD) (as version of PTA)


Injection Test (INS) (as version of PTA)
Build-up Test (BUS) (as version of PTA)
Fall off Test (FOS) (as version of PTA)

MRST – Multirate Step Test (as version of PTA)


SPT – Self-Pulse Test (as version of PTA)



See Also

...

Petroleum Industry / Upstream / Subsurface E&P Disciplines

Well & Reservoir Surveillance ]


Reference

...

SPE – John P. Spivey and W. John Lee, Applied Well Test Interpretation, SPE Textbook Series Vol. 13, 2013

Fekete – Reference Materials


Show If
group

...

arax


Panel
bgColorpapayawhip
titleARAX

KAPPA_DDA_Book v421.pdf

Kappa_DDA_Book v5.12.01.pdf



Show If
groupeditors


Panel
bgColorpapayawhip


Expand
titleEditor

Salam Al-Rbeawi, Wellbore Storage.pdf


SLB – WellTest 200 – 2001

Kappa DDA – 2011 

Fekete