Page tree

Synonym: Pressure Build-Up (PBU) = Build-Up Survey (BUS)

Pressure transient survey in producer during the pressure rise period caused by shutting well down or reducing its production rate (see Fig. 1):


Fig 1. Build-up Survey starting after well is closed at 3,600 hrs and going through pressure recovering for 7 days (blue dots).

The grey dash line shows bottom hole pressure history before 3,600 hrs in case it would have been recorded.

Interpretation



Interpretation of PBU is based on:


In some cases one can uses Horner model with simplified version of PBU interpretation procedure.


See Also


Petroleum Industry / Upstream / Subsurface E&P Disciplines / Well Testing / Pressure Testing Pressure Transient Analysis (PTA)

Well & Reservoir Surveillance ] [ Pressure Transient Analysis (PTA) ] [ Drawdown survey (DD) ]


  • No labels