Synonym: Behind-Casing Cross-Flow = Channeling
Specific type of Downhole cross-flow occurring behind the casing through:
Open space between casing and rocks (no cement filling) |
Channels and fractures in cement, filling the space between casing and rocks |
Gaps between cement sheath and rocks due to poor cement-rocks bond |
Gaps between cement sheath and casing due to poor cement-casing bond |
Fissure network in rocks behind cement sheath |
Fig. 1. Example of Behind-Casing Cross-Flow captured by the temperature and noise logs (courtesy of TGT) |
See Also
Petroleum Industry / Upstream / Petroleum Well / Well Performance Complications / Downhole cross-flow
[ Well Drilling ] [ Well completion ] [ Production (well flow status) ] [ Injection (well flow status) ] [ Flowing (well flow status) ] [ Shut-in (well flow status) ]