Page tree


Synonym
: Behind-Casing Cross-Flow = Channeling


Specific type of Downhole cross-flow occurring behind the casing through:

Open space between casing and rocks (no cement filling)
Channels and fractures in cement, filling the space between casing and rocks 
Gaps between cement sheath and rocks due to poor cement-rocks bond
Gaps between cement sheath and casing due to poor cement-casing bond

Fissure network in rocks behind cement sheath 

Case Study Total Flow - TGT

Fig. 1. Example of  Behind-Casing Cross-Flow captured by the temperature and noise logs (courtesy of TGT)


See Also


Petroleum Industry / Upstream / Petroleum Well / Well Performance ComplicationsDownhole cross-flow

Well Drilling ] [ Well completion ] [ Production (well flow status) ] [ Injection (well flow status) ] [ Flowing (well flow status) ] [ Shut-in (well flow status) ]


  • No labels