Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »


Ratio of field-wide Cumulative oil production Q^{\uparrow}_O to field-wide  Cumulative water injection Q_{WI}^{\downarrow}:

(1) {\rm ΣPIR} = \frac{Q^{\uparrow}_O}{Q^{\downarrow}_{WI}}


It measures how efficiently waterflood supports the oil production and represent one of the key Waterflood Diagnostics.


The PIR can be related to the current Instantaneous Voidage Replacement Ratio (IVRR) as:

(2) {\rm PIR}= \frac{1}{\rm IVRR} \cdot \frac{1-Y_w}{Y_w + (1-Y_w) \, \left[ \frac{B_o}{B_w} + \frac{B_g}{B_w} \, ( {\rm GOR} - R_s) \right] } = \frac{1}{\rm IVRR} \cdot \frac{1}{{\rm WOR} + \, \left[ \frac{B_o}{B_w} + \frac{B_g}{B_w} \, ( {\rm GOR} - R_s) \right] }

(see  (Instantaneous Voidage Replacement Ratio = IVRR:3) for derivation)

See Also


Petroleum Industry / Upstream /  Production / Subsurface Production / Field Study & Modelling /  Production Analysis / Waterflood Diagnostics

[ Instantaneous PIR ]



  • No labels