The direct methods assume that both drain-area formation pressure and bottomhole pressure data is available, at least in select time moments:
In case the drain-area formation pressure is not available the value of Productivity Index can be estimated from:
See Also
Petroleum Industry / Upstream / Production / Subsurface Production / Field Study & Modelling / Production Analysis