A specific study in Petroleum Production with a focus on prioritising production development and maintenance procedures based on their expected NPV / PI value.

In its simple form it can be thought as a spreadsheet with production development and maintenance procedures sorted out by a simple descending filter so that highest NPV / PI values are at the top of the list.


Investment Period = 5 years


FacilityActionBudget, M$NPV, M$PI, %
1Oil producer W-12Drilling1.00.880%
2Water Injector W-04WSO0.30.260%
3Booster Pump BP-12Installation0.20.2100%
4Oil producer W-12Acidization0.030.1333 %
5Oil producer W-09Pressure Test0.01
6Water Injector W-04Production Logging0.05


Depending on application (long-term MDP, short-term FDP, routine WRM etc) the Investment Planning metrics and workflow may vary and selection of production development and maintenance procedures is based on either:

  • Fixed investment budget

  • NPV threshold

  • PI threshold