Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 14 Next »



Optimising well-reservoir contactImproving the sweep efficiency to floodingImnporving displacement efficiencyOptimising the flowratesOptimising the wellbore completion and lift mechanism
Drilling new wellsHydraulic fracturingStimulation




The above activities are further classified into four execution mechanisms: 

SubsurfaceSurface
Drilling & CompletionWorkoverRate Optimisation

EOR facilities and procedures




This leads to the four major asset challenges:


 1. Where to drill the new well or side-track and how to complete it ?


2. Which wells to workover and how ?


3. Which wells to change the flow rate and whether increase or decrease ?


4. What fluid to inject ?


6. If there is a bottle neck in surface infrastructure and whether it needs update ?


The answers to these questions are provided by playing the various scenarios over the calibrated full-field flow model.


See Also


Petroleum Industry / Upstream /  Production / Subsurface Production





  • No labels