Optimising well-reservoir contact | Improving the sweep efficiency to flooding | Imnporving displacement efficiency | Optimising the flowrates | Optimising the wellbore completion and lift mechanism | ||
---|---|---|---|---|---|---|
Drilling new wells | Hydraulic fracturing | Stimulation |
The above activities are further classified into four execution mechanisms:
Subsurface | Surface | ||
---|---|---|---|
Drilling & Completion | Workover | Rate Optimisation | EOR facilities and procedures |
...
title | Content |
---|
Panel | ||||||
---|---|---|---|---|---|---|
| ||||||
|
There are five major categories in WRM
...
icon | false |
---|
1. Drilling new well or new side-track
2. Workover on existing wells
3. Changing flowrate on existing wells
4. Changing the temperature and composition of injection fluid
...
This leads to the four major asset challenges:
...