Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

@wikipedia


Downhole and wellhead construction facilitiesA set of subsurface and surface mechanical construction facilities related to a well.

If no mechanical construction is pulled down yet then completion status is is called open-hole.

This only happens when the drilling the Drilling rig is still on well site and waiting for well completion.

Every Every drilling eventually  eventually ends up with with completing the the well and then it gets status as cased-hole except sometimes the bottom part of the the well may stay stay open-hole to ensure the best well-reservoir contact.


Surface PipesAnnuliAnnuli components

Wellhead

Xmas tree

SRP Pump

SRP Control Unit

ESP Control Unit

Conductor

Casing

Liner

Tubing

Y-tool

A-Annulus

B-Annulus

C-Annulus

Packer

...

Pipe centralisers

ESP power cable

Data transmission cable 




Image Added

...

Excerpt Include
Well schematic
Well schematic
nopaneltrue

Fig. 1. Key elements of Well completion.Fig. 2. A simple example of Well schematic.



See Also

...

Petroleum Industry / Upstream / Petroleum Well 

Well schematic ] [ Single-string ] 

...