One of the Productivity Index diagnostics methods based on plotting pressure integral
LaTeX Math Inline |
---|
body | --uriencoded--G(t) = \int_0%5et \left( p_%7Bwf%7D(\tau) - p_e(\tau) \right) d\tau |
---|
|
vs
cumulatives LaTeX Math Inline |
---|
body | --uriencoded--Q_t(t) = \int_0%5et q_t(\tau) d\tau |
---|
|
where
| production/injection time |
| |
| |
LaTeX Math Inline |
---|
body | --uriencoded--p_%7Bwf%7D |
---|
|
| bottomhole pressure as function of time |
It shows unit slope on log-log plot for stabilized reservoir flow:
...
In case pressure data is available for a fair interpolation it is recommended to plot subsurface sandface cumulatives rather than than surface which which provides better linearity with pressure integral for Steady-State flow.
...