Specific production strategy which Petroleum Asset Team is following
The first FDP is based on the primary exploration data package and booked reserves and called Master Development Plan (MDP)
Multi-year production may reveal the need to revise FDP for various reasons:
- The changes in market conditions (hydrocarbon price volatility, production cost variations, appearance of new service technologies)
- The change in corporate economics (variation in corporate discount rate, variation of liability)
- The change in asset reserves structure or well/reservoir behaviour revealed during the execution of previous FDP
- Logistical mistakes of the previous FDP
- Deviations from previous FDP
There are basic regulations and guidelines on building MDP and building FDP.