Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »


The temperature of the cement during the cement pumping is different from the background rock temperature.

By checking the temperature difference one can assess how high the cement has gone up behind the casing.

This is the cheapest method to check the target interval was cemented, but it can not qualify if cement is filling the gap and develops a bond with casing and formation. 

Temperature Cement Logging is usually used in tandem with Gamma Density Cement Logging.

See Also


Petroleum Industry / Upstream /  Data Acquisition / Well & Reservoir Surveillance / Well logging / Cased-Hole Logging / Well Integrity Logging /  Cement Sheath Logging

Gamma Density Cement Logging ][ Acoustic Cement Bond Logging ]

Well & Log Analysis ]


  • No labels