Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Difference between cumulative water injection 

LaTeX Math Inline
body--uriencoded--Q_w%5e%7BW%5e%7B\downarrow%7D
 and cumulative water production 
LaTeX Math Inline
body--uriencoded-- Q_w%5e%7BW%5e%7B\uparrow%7D
 normalized on to the pore volume
LaTeX Math Inline
body--uriencoded--V_phi%7B\rm phi%7D
:

LaTeX Math Block
alignmentleft
{\rm NWR} =  \frac { B_w \cdot ( Q_w^W^{\downarrow} - Q_w^W^{\uparrow} ) /}{ V_{\rm phi} }


See Also

...

Petroleum Industry / Upstream /  Production / Subsurface Production / Field Study & Modelling /  Production Analysis / Waterflood Diagnostics / Water Replenishment (WR)

...