or in the offset wells and in this case is called pressure Pulse Interference Test (PCTPIT)
Workflow
...
1 | Designing flowrate variation pulse sequence for disturbing wells (also called generators) based on the field primary data |
2 | Field operations on suspending the downhole gauges (if PDG is not available) |
3 | Performing flowrate variations according to the PCT design |
4 | Retrieving the downhole gauges |
5 | Downloading the data from the downhole and surface gauges |
6 | Primary data processing (gauge syncronization and filtering) |
7 | Implementing pressure pulse-code decomposition (PCD) |
8 | Recognising the PTA type-library diffusion models for decomposed DTR/CTR and type-curve fitting them with analytical and/or numerical pressure diffusion models |
...