Highest value of Water Cut
Y_{wc} beyond which further well production is not economic.
It is directly related to WOR Cut-off as:
(1) | Y_{wc} = \frac{WOR_c}{1+WOR_c} |
The usual value is around
Y_{wc}= 98 \%.
See Also
Petroleum Industry / Upstream / Production / Subsurface Production / Field Study & Modelling / Production Analysis