Fig. 1. Dual-layer well schematic




q = q_1 + q_2




p_{wf} = p_e - q/J



J = J_1 + J_2



p_e = \frac{J_1 \cdot p_1 + J_2 \cdot (p_2- \rho \, g \, h)}{J_1 + J_2}


where

Well

total subsurface flowrate of the well

total well productivity Index

apparent formation pressure of dual-layer formation

true vertical height between the layers tops

wellbore fuid density

gravity constant
Layer #1

bottom-hole pr4essure at Layer #1 top

total subsurface flowrate of the Layer #1

formation pressure of the Layer #1

productivity Index of the Layer #1
Layer #2

bottom-hole pr4essure at Layer #2 top

total subsurface flowrate of the Layer #2

formation pressure of the Layer #2

productivity Index of the Layer #2


The above equations are valid for both producers and injectors.

See Also


Petroleum Industry / Upstream /  Production / Subsurface Production / Subsurface E&P Disciplines / Field Study & Modelling / Production Analysis / Productivity Diagnostics

Production Technology / Well Flow Performance ]

Formation pressure (Pe) ] Multi-layer IPR ]