Сomparative analysis between:


and


It is based on correlation between surface flowrate  and bottomhole pressure  as a function of tubing-head pressure  and formation pressure  and current reservoir saturation.



Application



Technology




Most reservoir engineers exploit material balance thinking which is based on long-term well-by-well surface flowrate targets  (whether producers or injectors).

In practice, the flowrate targets are closely related to bottomhole pressure and associated limitations and require a specialised analysis to set up the optimal lifting (completion, pump, chocke) parameters. 

This is primary domain of Well Flow Performance (WFP) analysis.


Well Flow Performance (WFP) is performed on stabilised wellbore and reservoir flow and does not cover transient behaviour which is one of the primary subjects of Well Testing domain.


The conventional WFP – Well Performance Analysis is perfomed as the  cross-plot with two model curves:

The intersection of IPR and VFP curves represent the stabilized flow (see Fig. 1)


Fig. 1. The stablised flow rate is represented as junction point of IPR and VLP curves.Fig. 2. The dead well scenario.


Given a tubing head pressure  the WFP Junction Point will be dynamic in time depending on current formation pressure (see Fig. 2) and formation saturation (see Fig. 3). 


Fig. 2. A sample case of stablised flow rate as function of formation pressure.Fig. 3. A sample case of stablised flow rate as function of formation water saturation and corresponding production water-cut.



Fig. 4. A bunch of IPRs at different formation pressures and VLPs at different THPs.


Workflow




  1. Check the current production rate against the production target from FDP

  2. If the diffference is big enough to justify the cost of production optimization (see point 8 below) then proceed to the step 3 below

  3. Assess formation pressure based on well tests

  4. Simulate IPR / VLP based on the current WOR/GOR

  5. Calculate the stabilized flow bottom-hole pressure

  6. Gather the current bottom-hole pressure

  7. Check up the calculation aganst the actual 

  8. Recommend the production optimisation activities to adjust bottom-hole pressure :

The above workflow is very simplistic and assumes single-layer formation with no cross-flow complications.

In practise, the Well Flow Performance (WFP) analysis is often very tentative and production technologists spend some time experimenting with well regimes on well-by-well basis. 


See Also


Petroleum Industry / Upstream / Production / Subsurface Production / Well & Reservoir Management

Subsurface E&P Disciplines / Production Technology 


  

References



Joe Dunn Clegg, Petroleum Engineering Handbook, Vol. IV – Production Operations Engineering, SPE, 2007


Michael Golan, Curtis H. Whitson, Well Performance, Tapir Edition, 1996


William Lyons, Working Guide to Petroleum and Natural Gas production Engineering, Elsevier Inc., First Edition, 2010


Shlumberge, Well Performance Manual