Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 21 Current »


Ground-based or platform-based engineering constructions for:


Custody Transfer Meter (CTM)

Gathering and allocation metering fluids from producing wells

Pumping and allocation metering fluids to injecting wells

Water Injection Facility

Primary processing of produced or pre-injected fluids

Waste utilisation facilities

Transporting fluids between the Surface Facilities components 


See Also


Petroleum Industry / Upstream / Production Surface Production Operations

Oil Production Plant ][ Oil Depot ]


  • No labels