Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »


Pressure transient survey in injector during the pressure rise period caused by opening well for injection or increasing its injection rate (see Fig. 1):



Fig 1. Drawdown pressure decline (blue dots) for 2,300 hrs after opening the well for production at 100 m3/d.


Interpretation


Interpretation of DD is based on:

Fig. 1PTA Diagnostic Plot for vertical well in single-layer homogeneous reservoir with impermeable circle boundary (PSS).

Gauge pressure is in blue and log-derivative is in red.

Fig. 2Pressure diffusion model fitting to pressure gauge data.

Gauge pressure is in blue and log-derivative is in red.

See Also


Petroleum Industry / Upstream / Subsurface E&P Disciplines / Well Testing / Pressure Testing

Pressure Transient Analysis (PTA) ]Pressure Build-Up (PBU) = Build-Up Survey (BUS) ][ Drawdown survey (DD) ]


  • No labels