Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »


Fig. 1. Dual-layer well schematic



(1) q = q_1 + q_2
(2) p_{wf} = p_e - q/J
(3) J = J_1 + J_2
(4) p_e = \frac{J_1 \cdot p_1 + J_2 \cdot p_2}{J_1 + J_2}

where

q

total subsurface flowrate of the well

J

total well productivity Index

p_e

apparanet formation pressure of dual-layer formation

q_1

total subsurface flowrate of the Layer #1

p_1

formation pressure of the Layer #1

J_1

productivity Index of the Layer #1

q_2

total subsurface flowrate of the Layer #2

p_2

formation pressure of the Layer #2

J_2

productivity Index of the Layer #2


The above equations are valid for both producers and injectors.

See Also


Petroleum Industry / Upstream /  Production / Subsurface Production / Subsurface E&P Disciplines / Field Study & Modelling / Production Analysis / Productivity Diagnostics

Production Technology / Well Flow Performance ]

Formation pressure (Pe) ]

  • No labels