Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »


A list of all Well Intervention activities on a given well.



Fig. 1. W-14 Well Intervention History


Table 1.  W-14 Well Intervention History


DateInterventionDesciption
116.03.1992Perforation[ 2344.6-2347.2 ], [ 2354.4-2370.0 ]
217.03.1992Put on streamNatural lift with 14 m3/d, no water
317.01.1994PLTCheck for inflow profile 
401.07.1995WorkoverChange of lift: Natural → ESP
504.07.1995Put on streamESP50 lift with 50 m3/d, no water
620.07.1998Shut-inPump failure
701.09.1998Put on streamESP50 lift with 40 m3/d, no water
801.11.2005PLTCheck for water source, Yw = 75 %
910.12.2005Workover

Water shut-off interval [ 2354.4-2370.0 ]

Add Perforation [ 2341.5-2343.3 ]

1025.12.2005Put on streamESP50 lift with 40 m3/d, Yw  = 10 %
1104.03.2012WorkoverChange of lift: ESP50 → ESP100
1206.03.2012Put on streamESP100 lift with 100 m3/d, Yw  = 82 %
1301.06.2018Shut-inHigh Yw  >= 98 %


See Also


Petroleum Industry / Upstream /  Production / Subsurface Production / Well & Reservoir Management / Well Intervention 






  • No labels