Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 15 Next »

@wikipedia


Hoist-aided well Intervention 


Completion-orientatedReservoir-orientatedReactivationAbandonment
Borehole cleaningMillingWater Shut-off (WSO)

FishingCement recoverySelective Stimulations

Replacing pumpBottomhole drillingSwitching to another pay

Replacing tubingPulling down extra casingConversion (producer → injector)

Replacing packerRemoving the casingConversion (injector→ producer)

Installing a bridge plug



Setting up the tubing/casing patch

`
Pumping corrosion inhibitors



Installing the gravel pack



Setting up the bottom hole cement plug





See Also


Petroleum Industry / Upstream / Subsurface E&P Disciplines / Workover Engineering



  • No labels