Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 10 Current »

@wikipedia


Part of Gas In Place (GIP) which can be recovered to the surface under specific FDP


The maximum volume of Oil Reserves for a newly explored field is called Estimated Ultimate Oil Recovery (EUOR).

See Also


Petroleum Industry / Upstream / Subsurface E&P Disciplines / Petroleum Geology / Gas In Place (GIP)

Hydrocarbon Reserves ] [ Oil reserves ]

  • No labels