Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 31 Next »


Specific production strategy which Petroleum Asset Team is following including annual schedule and budget allocation on:

Investment targetsAnnual P&L schedule
Surface facilitiesCapacity and tech spec of metering, production gathering, injection, water supply, on-site fluid processing, utilizations and pipelines
Well drillingQuantity/Types (producers, injectors, observers) and completion strategy
Workovers Selection/Types/Frequency
Production planningAverage and/or individual targets (producers, injectors)
SurveillanceSelection/Types/Frequency
StudiesSelection/Types/Frequency
RecommendationsFinancial, logistical, operational and technological


The newly explored field FDP is based on the primary exploration data package and booked reserves and called Master Development Plan (MDP)


Multi-year production may reveal the need to revise FDP for various reasons:


  • Changes in market conditions (hydrocarbon price volatility, production cost variations, changes in facility, transportation and service logistics, appearance of new service technologies)

  • Changes in corporate economics (variation in corporate discount rate, variation of liability)

  • Changes in Petroleum Asset reserves structure or well/reservoir behaviour revealed during the execution of previous FDP

  • Logistical mistakes of the previous FDP

  • Deviations from previous FDP during production period which had a bulk adverse effect on the Petroleum Asset performance

There are basic regulations and guidelines on building MDP and building FDP


See also


Petroleum Industry / Upstream /  Production




  • No labels