Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

Approximation of Material Balance Pressure @model for slightly compressibility flow:

(1) p(t) = p_i + \frac{\Delta Q(t)}{V_\phi \cdot c_t}

where

\Delta Q(t)

Cumulative Voidage Replacement Balance (CVRB) over time  t

V_\phi = V \cdot \phi_i

initial drainage volume of the main pay (excluding the aquifer and gas cap)

\phi_i = \phi(p_i)

initial porosity

c_t = c_\phi + c_o \, s_{oi} + c_g \, s_{gi} + c_w \, s_{wi}

total compressibility

c_\phi

pore compressibility 

s_{wi}

initial water saturation

s_{gi}

initial gas saturation

s_{oi}

initial oil saturation: s_{oi} = 1 - s_{wi} - s_{gi}

c_o, \, c_g, \, c_w

fluid compressibility of water phaseoil phase and gas phase

See Also


Petroleum Industry / Upstream /  Production / Subsurface Production / Field Study & Modelling / Production Analysis / Material Balance Analysis (MatBal) / Material Balance Pressure @model

[ Derivation of Slightly compressible Material Balance Pressure @model ]



  • No labels