Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Tip
iconfalse

1. Drilling new well or new side-track


2. Workover on existing wells


3. Changing flowrate on existing wells


4. Changing the temperature and chemical composition of injection fluid


5. Chaning Changing the surface infrastructure to remove the bottle-neckto avail all the subsurface production to be gathered in the tanks



This leads to the four major asset challengs:

...