...
Tip | ||
---|---|---|
| ||
1. Drilling new well or new side-track 2. Workoover Workover on existing wells 3. Changing flowrate on existing wells 4. Changing the temperature and chemical of injection fluid 5. Chaning the surface infrastructure to remove the bottle-neck |
...