Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Tip
iconfalse

1. Drilling new well or new side-track


2. Workoover Workover on existing wells


3. Changing flowrate on existing wells


4. Changing the temperature and chemical of injection fluid


5. Chaning the surface infrastructure to remove the bottle-neck

...