Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Expand
titleContent


Panel
bgColorAzure

Children Display
alltrue
depth1



There are five major categories in WRM


Tip
iconfalse

1. Drilling new well or new side-track


2. Workoover on existing wells


3. Changing flowrate on existing wells


4. Changing the temperature and chemical of injection fluid


5. Chaning the surface infrastructure to remove the bottle-neck



This leads to the four major asset challengs:


Tip
iconfalse

 1. Where to drill the new well or side-track and how to complete it ?


2. Which wells to workover and how ?


3. Which wells to change the flow rate and whether increase or decrease ?


4. What fluid to inject ?


6. If there is a bottle neck in surface infrastructure and whether it needs update ?


The answers to these questions are provided by playing the various scenarios over the calibrated full-field flow model. Include PageSFLBSZN:Управление разработкойSFLBSZN:Управление разработкой