...
- the formation fluid deliverability (the ability of reservoir to produce or take-in the fluid) which is called Inflow Performance Relation (IPR)
and
- wellbore fluid deliverability (the ability of well to lift up or lift down the fluid) and which is called Vertical Flow Performance (VFP) or Tubing Performance Relation (TPR)
...