Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Mathematical model simulating the process of fluid transport between petroleum reservoir and fluid tanks at surface and consisting of following components:


Not to be confused with Dynamic Reservoir Model often shorten as Dynamic Model or DM which is equivalent to Reservoir Flow Model.


See Also

...

Petroleum Industry / Upstream / Subsurface E&P Disciplines 

References

...

Show If
grouparax


Panel
bgColorPapayaWhip

1.




Show If
groupeditors


Panel
bgColorpapayawhip


Expand
titleEditor


Expand
titleContent


Panel
bgColorAzure

Children Display
alltrue



Цели


  • Прогноз добычи углеводородов при заданных режимах работы действующего фонда скважин 

  • Прогноз добычи углеводородов по итогам ГТМ

  • Оценка остаточных извлекаемых запасов углеводородов


Задачи


  • Построение геологической структуры залежиПостроение модели движения флюидов в пластах

  • Моделирование распространения литологических фаций

  • Моделирование распространения фильтрационно-емкостных и геомеханических характеристик пластов по каждой фации

  • Анализ чувствительности запасов к неопределенностям входных данных 


Типы динамических моделей в процессе разработки


Модель разработки месторождения углеводородов предусматривает математическое описание всего процесса передвижения запасов из пласта до точки учета объемов добываемой продукции.

Это требует сопровождающего моделирования процессов движения вторичных флюидов и теплообмена с окружающей средой на всем пути движения.


Основными видами движения, возникающих  в процессе разработки месторождений углеводородов, является движение мультифазного многокомпонентного флюида в


и связанные с ними процессы теплообмена с окружающей средой.

...