Investment Period = 5 years
| Facility | Action | Budget, M$ | NPV, M$ | PI, % |
---|
1 | Oil producer W-12 | Drilling | 1.0 | 0.8 | 80% | 2 | Water Injector W-04 | WSO | 0.3 | 0.2 | 60% | 3 | Booster Pump BP-12 | Installation | 0.2 | 0.2 | 100% | 4 | Oil producer W-12 | Acidization | 0.03 | 0.1 | 333 % | 5 | Oil producer W-09 | Pressure Test | 0.01 | – | – | 6 | Water Injector W-04 | Production Logging | 0.05 | – | – |
|