Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Identifies the first pipeline in which a downhole logging tool is moving during well logging


During the loging the tool starts through tubing which s a first barirer here and when it mopves below tubing shoe the casing becomes a

See Also

...

Petroleum Industry / Upstream / Subsurface E&P Disciplines /  Well & Log Analysis