Page tree


Highest value of  WOR beyond which further well production is not economic. 


It is directly related to Water Cut-off as:

(1) WOR_c = \frac{Y_{wc}}{1-Y_{wc}}


The usual value is around  WOR_c = 49.


See Also


Petroleum Industry / Upstream /  Production / Subsurface Production / Field Study & Modelling /  Production Analysis

Water Cut-off (Ywc) ]

  • No labels