Natural Gas Reservoir with initial formation temperature
T_i > T_{c, \rm max} above Cricondentherm
T_{c, \rm max} and builds condensate at separator (inside Vapour Liquid Envelope, see Fig. 1).
Fig. 1. Production path of the Wet Gas Reservoir on the Phase Equilibrium Diagram |
See Also
Petroleum Industry / Upstream / Subsurface E&P Disciplines / Petroleum Geology / Petroleum Reservoir / Natural Gas Reservoir
[ Hydrocarbon Reserves ][ Depletion ]