...
Excerpt |
---|
Pressure transient survey in injector during the pressure rise period caused by opening well for injection or increasing its injection rate |
(see Fig. 1):.
Despite the terminology conflist the
Fig 1. Drawdown pressure decline (blue dots) for 2,300 hrs after opening the well for production at 100 m3/d. |
...