...
Part of Gas In Place (GIP) which can be recovered to the surface under specific FDP.
The maximum volume of Oil Reserves for a newly explored field is called Estimated Ultimate Oil Recovery (EUOR).
See Also
...
Petroleum Industry / Upstream / Subsurface E&P Disciplines / Petroleum Geology / Gas In Place (GIP)
...