Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The percentage which recoverable reserves STHCR constitute of the current STHCIP is called Estimated Ultimate Recovery.


Unlike Hydrocarbon Initial In Place (HCIPHCIIP), which is a geological category, the  concepts of current Hydrocarbon In Place (HCIP)  and Hydrocarbon Reserves depend on the parameters of FDP based on petroleum reservoir, complexity, recovery on recovery method, recovery duration, surface logistics and economics. 

...

Petroleum Industry / Upstream / Subsurface E&P Disciplines / Petroleum Geology /  Petroleum Reservoir /  Petroleum Reservoir Fluids / Hydrocarbon Initial In Place (HCIIP) / Hydrocarbon In Place (HCIP) 

...