...
Tip | ||
---|---|---|
| ||
1. Drilling new well or new side-track 2. Workover on existing wells 3. Changing flowrate on existing wells 4. Changing the temperature and chemical composition of injection fluid 5. Chaning Changing the surface infrastructure to remove the bottle-neckto avail all the subsurface production to be gathered in the tanks |
This leads to the four major asset challengs:
...