Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Most reasonable use of Oil Control is to perform primary model runs to calibrate pressure reservoir volume and oil-in-place.

Once completed the history matching should be continued in Liquid Control or Pressure Control mode to replicate the actual Well Control


See also

...

Petroleum Industry / Upstream / Subsurface E&P Disciplines / Dynamic Flow Modelling / Reservoir Flow Modelling / Well control Control (Reservoir Flow Modelling)

Well Control ]