...
Production History | |||||
---|---|---|---|---|---|
Simulated total subsurface flowrate history,
| |||||
Simulated BHP history,
| |||||
Simulated formation pressure history,
| |||||
Simulated Productivity Index history,
| |||||
Simulated Cross-well interference history,
| |||||
Production Forecast | |||||
Rate forecast under Pressure Control regime,
| |||||
BHP forecast under Liquid Control regime,
| |||||
Formation pressure forecast under Liquid Control regime,
| |||||
Diagnostic Metrics | |||||
Cross-well interference map | |||||
Unit-rate Transient Response Matrix (UTRM) | |||||
Unit-rate Transient Response Spider (UTRS) | |||||
Material Balance Pressure Plot | |||||
Inflow Performance Relationship (IPR) | |||||
Cumulative Productivity Plot (Hall Plot) | |||||
J-plots | |||||
WOR diagnostics | |||||
GOR diagnostics | |||||
Primary Well & Reservoir properties | |||||
Potential drainage volume | |||||
Current dynamic drainage volume | |||||
Secondary Well & Reservoir properties | |||||
Apparent transmissibility | |||||
Apparent skin-factor | |||||
Fracture half-length | |||||
Dynamic fracture pressure threshold |
...