...
Tip | ||
---|---|---|
| ||
1. Drilling new well or new side-track 2. Workover on existing wells 3. Changing flowrate on existing wells 4. Changing the temperature and composition of injection fluid 5. Changing the surface infrastructure to avail all the fluent gathering of subsurface production to be gathered in the tanks |
This leads to the four major asset challengschallenges:
Tip | ||
---|---|---|
| ||
1. Where to drill the new well or side-track and how to complete it ? 2. Which wells to workover and how ? 3. Which wells to change the flow rate and whether increase or decrease ? 4. What fluid to inject ? 6. If there is a bottle neck in surface infrastructure and whether it needs update ? |
...