...
Excerpt |
---|
Pressure transient survey in producer during the pressure fall period caused by opening well for production or increasing its production rate |
(see Fig. 1):
Fig 1. Drawdown pressure decline (blue dots) for 2,300 hrs after opening the well for production at 100 m3/d. |
...