Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Excerpt

Pressure transient survey in producer during the pressure fall period caused by opening well for production or increasing its production rate

 (see Fig. 1):


Image RemovedImage Added

Fig 1. Drawdown starting after well is closed at 3,600 hrs and going through pressure recovering for 7 days (blue dots).

The grey dash line shows bottom hole pressure history before 3,600 hrs in case it would have been recorded.

...