Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Given a tubing head pressure 

LaTeX Math Inline
bodyp_s
the WFP Junction Point will be dynamic in time depending on current formation npressure pressure (see Fig. 2) and formation saturation (see Fig. 3). 


Image Added

Image Added

Fig. 2. A sample case of stablised flow rate as function of formation pressure.Fig. 3. A sample case of stablised flow rate as function of formation water saturation and corresponding production water-cut.


Workflow

...



  1. Check the current production rate against the production target from FDP

  2. If the diffference is big enough to justify the cost of production optimization then proceed to the next step

  3. Assess formation saturation in pay zones based on well tests

  4. Assess formation pressure based on well tests

  5. Calculate the stabilized flow bottom-hole pressure

  6. Gather the current bottom-hole pressure
    LaTeX Math Inline
    bodyp_{wf}


  7. Check up the calculation aganst the actual 
    LaTeX Math Inline
    bodyp_{wf}


  8. Recommend the production optimisation activities to adjust bottom-hole pressure 
    LaTeX Math Inline
    bodyp_{wf}
    :

    • adjusting the choke at surface

    • adjusting the pump settings from surface 

    • changing the pump depth

    • changing the tubing size

    • changing the pump

The above workflow is very simplistic and assumes single-layer formation with no cross-flow complications.


Anchor
IPR
IPR

IPR – Inflow Performance Relationship

...